Số TBMCH | Lần sửa | Tên gói | Thời điểm đăng | Thời điểm chào hàng |
---|---|---|---|---|
HF.FM.UFC.98KI.26 | 6 | Renovation of Vinh Phuc Dormitory (phase 1) | 16/12/2021 | 24/12/2021 |
HF.FM.UFC.98KI.24 | 6 | Replace Air conditioner in Locker C & Locker AM (2nd floor) | 14/12/2021 | 24/12/2021 |
AMP.BM.PA.98Ki.04 | 3 | Improve Pre-Washing process | 16/11/2021 | 30/11/2021 |
HF.FM.UFC.98KI.21 | 3 | ROOF COVERED WALKWAY (VQ - LOG) | 04/11/2021 | 18/11/2021 |
HF.FM.UFC.98KI.20 | 4 | UPGRADE ROAD BETWEEN AMP FACTORY | 29/10/2021 | 15/11/2021 |
HF.FM.UFC.98KI.19 | 3 | UPGRADE CAFETERIA CANTEEN 1 | 30/09/2021 | 15/10/2021 |
HF.FM.UFC.98KI.18 | 3 | RE-LAYOUT LP PARKING AREA (4R FACTORY) | 30/09/2021 | 15/10/2021 |
ADM.98KI.02 | 3 | HNO 6th floor renovation | 24/09/2021 | 12/10/2021 |
HF.FM.UFC.98KI.17 | 2 | Renovate Restroom in Vinh Phuc factory | 14/09/2021 | 30/09/2021 |
HNM.UFC.FM.98KI.01 | 4 | Setup E,A,W & Hệ thống điều hòa (Case P/H) | 28/05/2021 | 10/06/2021 |