Code |
Modified |
Bid name |
Publish time |
Opening time |
HF.ENG.AE.100KI.01 |
16 |
RENOVATION OF AE MULTI LINE FROM BY HAND TO AUTOMATIC |
21/06/2023 |
03/07/2023 |
AMP.FC.PL.100KI.01 |
3 |
INSTALL INVERTER FOR 2 SUPPLY FAN 75KW |
20/06/2023 |
28/06/2023 |
HF.ENG.MC.100KI.11 |
5 |
TRANSPORT FOR WASHING MACHINE |
12/06/2023 |
29/06/2023 |
HF.ENG.MC.100KI.10 |
3 |
WASHING ROBOT MACHINE FOR LINE HEAD |
12/06/2023 |
22/06/2023 |
HR.100KI.01 |
3 |
Big kitchen facility for canteen 2,3 |
12/06/2023 |
26/06/2023 |
HF.FM.UFC.100KI.11 |
3 |
Canteen 1 construction (Building & big facility for canteen 1) |
12/06/2023 |
26/06/2023 |
HF.ENG.MC.100KI.12 |
4 |
Air leak tester & Air flow tester (Cosmo) for line Case/Head |
08/06/2023 |
20/06/2023 |
HF.FRM.PAPO.100KI.03 |
3 |
"Investment replacement RO&DI water system for ABS4 fac2 (Đầu tư thay thế hệ thống nước RO và DI cho dây chuyền ABS4 nhà máy 2)" |
08/06/2023 |
19/06/2023 |
HF.ENG.DC.100KI.03 |
3 |
Investment Koshin Jacket machine |
06/06/2023 |
19/06/2023 |
HF.FRM.PAPO.100KI.04 |
3 |
Invest system re-use waste heat for Heat pump PA fac1 |
05/06/2023 |
16/06/2023 |