Số TBMCH | Lần sửa | Tên gói | Thời điểm đăng | Thời điểm chào hàng |
---|---|---|---|---|
HR.98KI.01 | 3 | Replace canteen equipment | 29/04/2021 | 14/05/2021 |
HF.ENG.AE.98KI.05 | 3 | Investment replace air leak tester at AE/AF | 29/04/2021 | 14/05/2021 |
HNM.FM.UFC.98KI.03 | 3 | Recycle domestic waste water treatment system (Step 2) | 27/04/2021 | 12/05/2021 |
SPO.98Ki.02 | 4 | Investment 01 strapping machine & 02 pallet wrappers | 26/04/2021 | 12/05/2021 |
HNMO.ADM.98KI.01 | 4 | Equipment for In/Out control system of HVN Dormitory | 26/04/2021 | 14/05/2021 |
AMS.CS.98KI.01 | 4 | Set up equipment AMCS | 26/04/2021 | 12/05/2021 |
VPO.ADM.98KI.01 | 3 | Equipment for In/Out control system of VPO Dormitory | 09/04/2021 | 20/04/2021 |
HNM.ENG.MC.98Ki.13 | 3 | Thiết bị cải cách thể chất ( băng tải,....) (Case P/H) | 09/04/2021 | 20/04/2021 |
HF.FRM.PAPO.98KI.08 | 3 | Investment Heatpump system step2 (Heatpump in winter) | 09/04/2021 | 20/04/2021 |
HF.FRM.PAPO.98KI.07 | 5 | Investment replacement DI water system for ABS2 & ED1 Fac1 | 05/04/2021 | 20/04/2021 |