Số TBMCH | Lần sửa | Tên gói | Thời điểm đăng | Thời điểm chào hàng |
---|---|---|---|---|
ADM.HR.100KI.04 | 3 | Installing RO Piping system for 3 canteens | 17/01/2024 | 25/01/2024 |
HF.PL.100KI.02 | 2 | THAY THẾ MÁY CHÀ NỀN | 15/01/2024 | 24/01/2024 |
ADM.ADM.100KI.06 | 3 | Installing water softener system (RO) in canteen at VP Dormitory | 12/01/2024 | 22/01/2024 |
HNM.ENG.DC.100KI.06 | 3 | MÁY HÀN TIG AC/DC 500 | 09/01/2024 | 18/01/2024 |
HF.FM.UFC.100KI.20 | 3 | UPGRADE PMS SYSTEM AT VPC | 13/12/2023 | 22/12/2023 |
HF.FRM.PAPO.100Ki.11 | 3 | ULTRASONIC CLEANING MOLD PO HF | 11/12/2023 | 24/12/2023 |
ADM.HR.100Ki.03 | 4 | DISH WASHING MACHINE & CONVEYOR CT 1.2.3 | 01/12/2023 | 28/12/2023 |
HF.FC.MS.100Ki.04 | 3 | PACKING LINE 03 | 29/11/2023 | 12/12/2023 |
HF.FC.MS.100Ki.05 | 3 | PACKING LINE 04 | 29/11/2023 | 12/12/2023 |
HF.FC.MS.100Ki.06 | 3 | UP CAPACITY FOR LINE | 29/11/2023 | 12/12/2023 |