Số TBMCH | Lần sửa | Tên gói | Thời điểm đăng | Thời điểm chào hàng |
---|---|---|---|---|
HF.ENG.MC-SIN 99KI.01 | 3 | Invest in replacing density analysis eqiupment | 12/09/2022 | 26/09/2022 |
HF.FRM.PAPO.99KI.05 | 3 | Plastic mold: Cover, R/L Body | 08/09/2022 | 20/09/2022 |
ADM.99KI.02 | 3 | Investment camera system in the local parts area | 08/09/2022 | 22/09/2022 |
ITIM.99KI.03 | 4 | Printer Project Phase 2 Hardware | 06/09/2022 | 19/09/2022 |
QMQC.99KI.08 | 3 | Production innovation rubber composition analysis machine | 30/08/2022 | 12/09/2022 |
HNM.FM.99KI.05 | 3 | Renovate Water heating solar energy for Ha Nam dormitory | 24/08/2022 | 06/09/2022 |
HF.ENG.DC.99KI.06 | 3 | Investment Holding Furnace of LPDC machine | 24/08/2022 | 08/09/2022 |
HF.FM.UFC.99KI.13 | 5 | REPLACE OLD BOILER (26 YEAR USED) | 16/08/2022 | 26/08/2022 |
HF.FM.UFC.99Ki.12 | 5 | REPLACE OLD AIR COMPRESSOR | 16/08/2022 | 26/08/2022 |
HF.ENG.DC.99KI.05 | 3 | Investment Koshin chiller machine system | 16/08/2022 | 26/08/2022 |