Code | Modified | Bid name | Publish time | Opening time |
---|---|---|---|---|
ADM.ADM.100KI.06 | 3 | Installing water softener system (RO) in canteen at VP Dormitory | 12/01/2024 | 22/01/2024 |
HNM.ENG.DC.100KI.06 | 3 | MÁY HÀN TIG AC/DC 500 | 09/01/2024 | 18/01/2024 |
ITM.100KI.12 | 3 | Thanh lý 225 thiết bị cũ (máy in, máy scan) | 18/12/2023 | 05/01/2024 |
ITIM.100KI.08 | 3 | Storage replacement | 18/12/2023 | 02/01/2024 |
HNM.FM.UFC.100KI.09 | 3 | AM Packing Lot Expansion in Ha Nam | 15/12/2023 | 27/12/2023 |
HF.FM.UFC.100KI.20 | 3 | UPGRADE PMS SYSTEM AT VPC | 13/12/2023 | 22/12/2023 |
HF.FRM.PAPO.100Ki.11 | 3 | ULTRASONIC CLEANING MOLD PO HF | 11/12/2023 | 24/12/2023 |
ADM.HR.100Ki.03 | 4 | DISH WASHING MACHINE & CONVEYOR CT 1.2.3 | 01/12/2023 | 28/12/2023 |
HF.FC.MS.100Ki.04 | 3 | PACKING LINE 03 | 29/11/2023 | 12/12/2023 |
HF.FC.MS.100Ki.05 | 3 | PACKING LINE 04 | 29/11/2023 | 12/12/2023 |